|
ABSTRACT
ISSN: 0975-4024
Title |
: |
A MULTICRITERIA PERMUTATION FLOWSHOP SCHEDULING PROBLEM WITH SETUP TIMES |
Authors |
: |
M.Saravanan, S.Joseph Dominic Vijayakumar, R.Srinivasan |
Keywords |
: |
Permutation flow shop scheduling, Makespan, Tardiness, Earliness, Total completion time, Simulated annealing algorithm, B-Grasp approach, Artificial Immune System algorithm. |
Issue Date |
: |
Jun - Jul 2014 |
Abstract |
: |
The permutation flow shop scheduling problem has been completely concentrated on in late decades, both from single objective and additionally from multi-objective points of view. To the best of our information, little has been carried out with respect to the multi-objective flow shop with sequence dependent setup times are acknowledged. As setup times and multi-criteria problems are significant in industry, we must concentrate on this area. We propose a simple and powerful meta-heuristic algorithm as artificial immune system for the sequence dependent setup time’s flow shop problem with several criteria. The objective functions are framed to simultaneously minimize the makespan time, tardiness time, earliness time and total completion time. The proposed approach is in conjunction with the constructive heuristic of Nawaz et al. evaluated using benchmark problems taken from Taillard and compared with the prevailing Simulated annealing approach and B-Grasp approach. Computational experiments indicate that the proposed algorithm is better than the SA approach and B-Grasp approach in all cases and can be very well applied to find better schedule. |
Page(s) |
: |
1329-1339 |
ISSN |
: |
0975-4024 |
Source |
: |
Vol. 6, No.3 |
|