e-ISSN : 0975-3397
Print ISSN : 2229-5631
Home | About Us | Contact Us

ARTICLES IN PRESS

Articles in Press

ISSUES

Current Issue
Archives

CALL FOR PAPERS

CFP 2021

TOPICS

IJCSE Topics

EDITORIAL BOARD

Editors

Indexed in

oa
 

ABSTRACT

Title : A Dynamic Slack Management Technique for Real-Time Distributed Embedded System with Enhanced Fault Tolerance and Resource Constraints
Authors : Santhi Baskaran, I. Gugan, A. Aswin Kumar, D. Govindarajan
Keywords : Real-time; slack; precedence constraints; resource constraint; resource reclaiming; fault tolerance.
Issue Date : January 2011.
Abstract :
This project work aims to develop a dynamic slack management technique, for real-time distributed embedded systems to reduce the total energy consumption in addition to timing, precedence and resource constraints. The Slack Distribution Technique proposed considers a modified Feedback Control Scheduling (FCS) algorithm. This algorithm schedules dependent tasks effectively with precedence and resource constraints. It further minimizes the schedule length and utilizes the available slack to increase the energy efficiency. A fault tolerant mechanism uses a deferred-active-backup scheme increases the schedulability and provides reliability to the system.
Page(s) : 236-245
ISSN : 0975–3397
Source : Vol. 3, Issue.01

All Rights Reserved © 2009-2024 Engg Journals Publications
Page copy protected against web site content infringement by CopyscapeCreative Commons License