Abstract |
: |
The problem of scheduling, both maintenance and production, was a work of many articles. The algorithms genetics, ant, and multi-agent, gives solutions approaches with this problem. Modelled the problem in a simple and concrete way, pushed us to propose a graph connecting maintenance and the production, with weightings realities. To develop quality, and the validity of the model, a statistical tool is used for the calculation of the factors of variances, in order to improve the output of the production. |